CHRISTCHURCH | NEW ZEALAND | yeahnahproductions.nz@gmail.com | Tel: 027 777 4443

  • White Facebook Icon
  • White Instagram Icon
  • White YouTube Icon
  • White Twitter Icon

New Taramakau Bridge on SH6

SH6 New Taramakau Bridge Project (By Drone), Greymouth, New Zealand The new two-lane bridge will be built between Greymouth and the Kumara Junction, 30 metres downstream of the existing single-lane road and rail bridge. The new bridge will be 250 metres long, 10 metres high and 15 metres wide. The project will see a section of State Highway 6 realigned and an overpass built to take road traffic over the railway line. A 2.5 metre wide, off-road cycle and pedestrian facility that will link into an existing cycle track will also be built. The existing bridge will remain in place and will be used solely as a rail bridge. The clip-on cycle and walking bridge will be installed at another yet to be determined site. This is a Government Accelerated Regional Roading Project (external link). Fulton Hogan has been awarded the contract for the project. Work is expected to be complete by the end of 2018. From NZTA's website about the project. Link